Commercial Stripout – GSK Worthing
![Commercial Stripout – GSK Worthing](https://trojanstripout.co.uk/wp-content/uploads/2023/06/thumbnail-1.jpg)
Description of Activity
Trojan had to:
- STRIP EXISTING VINYL AND CLADDING FINISHES FROM CEILINGS
- REMOVE DOORS
- ROLLER SHUTTER DOORS
- REMOVE RESIN COVED SKIRTINGS
- USING VARIOUS HAND AND BATTERY OPERATED HAND TOOLS
- WORKING AT ALL TIMES IN A SAFETY CONTROLLED AND MINDFUL MANNER TO REDUCE AND OR ELIMINATE RISK AND IDENTIFY HAZARDS
- LEAVE SITE CLEAN TIDY AND SWEPT THROUGHLEAVE SITE CLEAN TIDY AND SWEPT THROUGH