skip to Main Content

Commercial Stripout – Chelsea hub 2 Cobham

Commercial Stripout – Chelsea Hub 2 Cobham

Description of Activity

  1. TROJAN ARE TASKED WITH THE STRIP-OUT OF THE CURRENT CHANGING ROOMS AND WASH AREA READY FOR REDEVELOPMENT
  2. ATTEND SITE SECURITY AND RECEIVE PASS AND PERMISSION-TO WORK
  3. ATTEND SITE SAFETY INDUCTION FROM PRINCIPLE CONTRACTOR
  4. INTEGRATE INFORMATION RECEIVED INTO TROJAN SITE SAFETY INDUCTION
  5. RECEIVE FROM P/C ALL POWER AND SERVICES ISOLATION’S
  6. USING VARIOUS HAND AND BATTERY OPERATED HAND TOOLS
  7. WORKING AT ALL TIMES IN A SAFETY CONTROLLED AND MINDFUL MANNER TO REDUCE AND OR ELIMINATE RISK AND IDENTIFY HAZARDS
  8. REMOVE ALL LAY IN GRID SYSTEM CEILINGS IN THE WORK AREAS
  9. REMOVE SLOWLY AND CAREFULLY THE EXISTING LOCKERS AND RELOCATE TO AGREED AREA
  10. STRIP-OUT ALL SANITARY WEAR
  11. STRIP-OUT AND REMOVE ALL DOORS AND FRAMES
  12. STRIP UP ALL VINYL FLOORING IN THE DESIGNATED AREAS
  13. STRIP UP AND INVESTIGATE THE MAKE UP OF THE FLOORING TO THE TOILET AND CHANGING ROOM AREAS
  14. WORKING FROM THE TOP STRIP-OUT AND DISMANTLE THE EXISTING PARTITION WALL 92m2
  15. MOVE ALL WASTE TO A SITED SKIP
  16. LEAVE SITE CLEAN TIDY AND SWEPT THROUGHLEAVE SITE CLEAN TIDY AND SWEPT THROUGH

 